We manufacture a wide assortment of PMC well point dewatering systems that are used to remove excess of water from saturated soil mass which is called for to make working easier in wet conditions and possible below natural water level. The entire range is designed using qualitative raw material sourced from reliable vendors.
The PMC well point dewatering systems are effectively used in the soils that have sand contents of about 20% or more.
The PMC well point system has been proved most effective way of Dewatering for many types of civil works such as:
Excavations for basements and foundations of Buildings
Foundations of DAMS, Bridges, Power houses & Underground tanks
Laying of deep sewer lines
Excavations and lining works for canals and channels etc
Tunnel work
Sub-ways (Tube Railway etc.)
Reclamation of land
Water supply
Reclamation of chemicals
Advantage:
Before starting the construction work well point system helps in dewatering the construction, allowing unimpeded excavation, which reduces down time of the work force and invaluable time is saved.
Hydrostatic pressure from the bottoms of excavations is reduced, preventing them from heaving. It also protects sloughing or failure of slopes.
To support the sides of excavations Amount of sheeting required
No fear of “cave ins” as the fine soil particles are not removed from the surrounding area. It kept he soil stabilized.